Cutoff Wall Construction for Gold Mine Tailings Management
Challenge
The Greenstone Gold Mine project required a specialized geotechnical contractor to install cutoff walls around its future management facilities. The primary objective was to prevent contaminants from migrating into adjacent water bodies, ensuring environmental compliance and long-term sustainability. The original design called for soil-bentonite and cement-bentonite cutoff walls. However, the project encountered significant challenges, including:
Solution
Forgen collaborated closely with the project engineer to adapt to the evolving site conditions. The team proposed and executed a redesign of the cutoff wall using Deep Soil Mixing (DSM) technology, offering several key advantages:
A total of 72,500 square feet of DSM was installed to a depth of 42 feet, covering a total cutoff wall length of 2,400 feet.
Results
The project was completed successfully, delivering several critical outcomes:
Our performance on this project highlights our ability to overcome complex geotechnical challenges and deliver effective, tailored solutions in demanding environments.